top of page

A BRIEF HISTORY OF THE RAILWAY

In 1967, six schoolboys decided to try to save some items of interest from the rapidly-disappearing local narrow gauge railways. A site was found alongside a brickworks at Hesketh Bank and some equipment acquired.

 

In September 1967 work began on laying the first 150 yards of 2ft gauge track, using redundant rails and a set of axles on which the first item of rolling stock was built.

 

The group continued to acquire more rolling stock from nearby industrial sites, and work started on building an engine shed and workshop.

In 1969,  at an auction on closure of the Dinorwic slate quarries at Llanberis, North Wales, the group acquired the remains of a steam locomotive.


The locomotive, the Hunslet quarry engine

Irish Mail, was incomplete, with the boiler and other vital parts missing.

 

Undaunted, the group continued to search for suitable parts to rebuild the locomotive, and over the next ten years acquired or made the parts to restore Irish Mail to working order.

In 1980 the Railway saw its first steam-hauled trains in operation.

The Railway’s collection has continued to expand, and we now have five steam locomotives on site, although not all are fully restored. 

 

The search for additional locomotives and rolling stock carried on, and today the Railway has a comprehensive collection. 

 

A more detailed illustrated guide book is available from the Railway's station shop.

bottom of page